Heavy Lift About Submit a Listing FAQ
Search
heavy lift
Partners
International Transport JournalITJ
Worldwide Project ConsortiumWWPC
Specialized Carriers & Rigging AssociationSC&RA
World Cargo NewsWorld Cargo News

Browse Directory
Heavy cargo EuropeHeavy Lift Europe
Heavy lift specialists in Middle EastHeavy Lift Middle East
Heavy load specialists in North AmericaHeavy Lift US
Heavy lift operators in South AmericaHeavy Lift South America
Heavy lift companies in AsiaHeavy Lift Asia

 

 

 

flag   THE RIEDL GROUP
the riedl group
 
air cargospacemarine transportspacesurface transportationspaceheavy lift cranespace
 

POWER STATION TRANSPORTATION

POWER STATION TRANSPORTATION
Lifting Operation of the 310 tons Gas Turbine by a Strans Jacks Lifting System

 

 

spacer During the year 2005 and 2006 TRANSGERMA shipped three blocks of SIEMENS CCPP (Combined Cycled Power Plant) from Germany and other European countries to Rudeshur/Iran, approx. 60km south west of Teheran. Each Block covered one Gas Turbine weighing 310 m/tons, one Generator weighing 320 m/tons and one Transformer weighing 260 m/tons.



All heavy items and accessories were loaded in Bremen and other ship loads were loaded in Cons-tanza and Gijon /Spain. Port of entry in Iran was Bandar Abbas. From there the only suitable road exists to the site which was a distance of approx. 2,000 km. Each block was moved in a convoy of 2 x 24 axles and 1 x 16 axles plus numerous trucks with ODC and general cargo. Our Iranian partners also effected the customs clearance for account of the client and on behalf of the owners. At the site in Rudeshur we had to lift the Gas Turbine and Generator onto foundations by means of a specially designed and built strand jack gantry. The Transformers were skid-ded and jacked onto foundations. To place the heavy components onto foundations was performed under the supervision of the site management and the Siemens service engineers. All ODC and general cargo we had to offload to ground in a designated intermediate storage area. The three CCPP and all periphery equipment for EBOP and MBOP (mechanical balance of plant and electrical balance of plant) as well as tank plant covered approx. 2.500 m/tons of heavy lifts and approx. 48.000 cbm of ODC and general cargo.

08/06